Kamen Südfeld 2nd phase of construction
Constructor          Municipality of Kamen
Period          Spring 2009 - End of May 2010
Contract volume          1.2 million euro


On behalf of the municipality of Kamen we were commissioned to renew the sewer system in the street "Südfeld" in Spring 2009.
In the course of the project an area with saturated turf layers was also crossed. In order to avoid the settlement of existing lines waterproof sheet piling was used. Wittfeld overcame this obstacle as can be seen in the photos.

Technical details
Stoneware DN 800 by driving
       145
m
Construction of a lowering shaft, diameter 4.0 m, 6.0 m deep


Open pipe laying DN 400
         75
m
Open pipe laying DN 500
         65
m
Open pipe laying DN 600
         75
m
Open pipe laying DN 700
       140
m
Open pipe laying DN 800
         30
m

We were able to sink the driving shaft in difficult groundwater conditions.

At the end of the sewer construction work the local street was completely renewed; a total of 2,500 m².